KIWI, HOLISDER project partner responsible for UK pilot site activities, reports on technical deployment progress. Some significant technical changes have been made within the structure of HOLISDER system which is being installed inside the residential building in Greenwich, London, England. The entire solution is currently being tested.
As Mircea Bucur from KIWI explains: We have deployed metering and control infrastructure for the HVAC system (electricity meters and control equipment for the 6 chillers serving the building) as well as temperature, humidity, CO2 and TVOC monitoring equipment for the management suite situated on the first floor of the building. We also have access to the electricity sub metering system providing half hourly data for the entire building (around 40 sub metering points). In addition, we hope to gain access in the near future to the newly installed heating and cooling energy meters (the system has just been deployed).
The HOLISDER Consortium is currently preparing for the 5th General Assembly which is going to be held in Athens, Greece, between 24th and 27th September 2019. During this meeting all important technical issues proving the progress within the project’s life cycle will be discussed and summarized.